FINUDA RUN SUMMARY (October 2003):


RUN DATE
(dd/mm/yy)
START TIME
(hh:mm)
STOP TIME
(hh:mm)
TRIGGER EVENTS TOF ISIM & OSIM LMD STB B
FIELD
COMMENTS
FINU00003 20/10/03 17:03 18:29 HYP .OR. BHABHA 3773 ON ON ON ON ON No injection inhibit 
FINU00004 20/10/03 18:29 21:22 HYP .OR. BHABHA 10378 ON ON ON ON ON  
FINU00005 20/10/03 21:25 00:14 HYP .OR. BHABHA 9238 ON ON ON ON ON Scrapers optimization
FINU00006 21/10/03 00:43 04:49 HYP .OR. BHABHA 15001 ON ON ON ON ON  
FINU00008 21/10/03 05:24 06:30 HYP .OR. BHABHA 3366 ON ON ON ON ON Stopped due to 
beams blow-up
FINU00009 21/10/03 06:40 08:29 HYP .OR. BHABHA 5920 ON ON ON ON ON  
FINU00010 21/10/03 08:47 10:07 HYP .OR. BHABHA 4626 ON ON ON ON ON  
FINU00012 21/10/03 10:13 10:49 HYP .OR. BHABHA 2532 ON ON ON ON ON Stopped due to 
LMD trips
FINU00016 21/10/03 15:12 18:02 HYP .OR. BHABHA 9886 ON ON ON ON ON LMD +HV = 1600 V
LMD -HV = 3200 V
DAPHNE energy scan
FINU00019 21/10/03 19:24 20:06 HYP 405 ON ON ON ON ON LMD +HV = 1600 V
LMD -HV = 3200 V
Mult. TOFONE = 2
FINU00020 21/10/03 20:08 21:30 HYP 1340 ON ON ON ON ON  
FINU00021 21/10/03 21:30 01:55 HYP 4639 ON ON ON ON ON From now 
tofino slab # 9 
inside the trigger
FINU00023 22/10/03 02:10 03:49 HYP  1224 ON ON ON ON ON  
FINU00024 22/10/03 03:50 05:03 HYP  1228 ON ON ON ON ON  
FINU00025 22/10/03 05:11 07:04 HYP .OR. BHABHA 9442 ON ON ON ON ON  
FINU00026 22/10/03 07:28 09:03 HYP 990 ON ON ON ON ON LMD tripped at 8:30
FINU00028 22/10/03 09:14 10:02 HYP 697 ON ON ON ON ON  
FINU00029 22/10/03 10:46 11:24 HYP 527 ON ON ON ON ON  
FINU00032 22/10/03 14:07 15:28 HYP .OR. BHABHA 7026 ON ON ON ON ON LMD +HV 
from 1800 to 1850 V
FINU00033 22/10/03 15:29 15:48 HYP .OR. BHABHA 1284 ON ON ON ON ON Strobe time tests 
in the TRIG-SEL
FINU00034 22/10/03 15:59 17:29 HYP .OR. BHABHA 4971 ON ON ON ON ON  
FINU00035 22/10/03 17:33 20:18 HYP .OR. BHABHA 15118 ON ON ON ON ON  
FINU00036 22/10/03 20:19 23:00 HYP .OR. BHABHA 15648 ON ON ON ON ON  
FINU00039 22/10/03 23:55 04:56 HYP .OR. BHABHA 33471 ON ON ON ON ON  
FINU00040 23/10/03 04:58 09:09 HYP .OR. BHABHA 27125 ON ON ON ON ON  
FINU00043 23/10/03 23:40 01:55 HYP .OR. BHABHA 12702 ON ON ON ON ON  
FINU00044 24/10/03 02:00 04:25 HYP .OR. BHABHA 15001 ON ON ON ON ON  
FINU00045 24/10/03 04:26 05:27 HYP .OR. BHABHA 6033 ON ON ON ON ON  
FINU00046 24/10/03 05:31 07:25 HYP .OR. BHABHA 11343 ON ON ON ON ON  
COSM04507 24/10/03 08:01 08:55 (.OR. FINO) .AND. (.OR. FONE) 8341 ON ON ON ON ON DAPHNE OFF 
Cosmic rays
COSM04508 24/10/03 08:59 10:37 (.OR. FINO) .AND. (.OR. FONE) 15001 ON ON ON ON ON DAPHNE OFF 
Cosmic rays
COSM04509 24/10/03 11:32 13:10 (.OR. FINO) .AND. (.OR. FONE) 12240 ON ON ON ON ON DAPHNE OFF 
Cosmic rays
N.B. FROM NOW ON:
attenuation of factor 2 in tofino slabs
FINU00047 24/10/03 13:58 15:49 HYP .OR. BHABHA 7799 ON ON ON ON ON Up to event 1551 plagued from LMD 
and STRAWS trips
FINU00048 24/10/03 16:06 17:01 HYP .OR. BHABHA 3590 ON ON ON ON ON  He-bag inflating
FINU00049 24/10/03 18:33 19:39 HYP .OR. BHABHA 5104 ON ON ON ON ON  
FINU00050 24/10/03 20:39 21:12  HYP .OR. BHABHA 2912 ON ON ON ON ON In this run 
no attenuation 
in tofino slab # 5
FINU00051 24/10/03 21:41 22:28 HYP .OR. BHABHA 3933 ON ON ON ON ON In this run 
no attenuation 
in tofino slab # 5 
FINU00053 25/10/03 00:20 08:19 HYP 7760 ON ON ON ON ON  From 04:50 until endrun LMD 3i, 3o and 4o in trip or in OFF
FINU00054 25/10/03 08:24 10:29 HYP 2025 ON ON ON ON ON  LMD 3i, 3o and 4o 
in trip or in OFF
N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. Changed gas mixture 
in LMD and alignment work on trigger made
Tofino HV = 14 kV set
FINU00056 25/10/03 21:19 23:21 HYP .OR. BHABHA 13293 ON ON ON ON ON  
FINU00057 25/10/03 23:49 00:15 HYP .OR. BHABHA 2686 ON ON ON ON ON Work on LMD 3i HV from 00:00
3i HV are:
+1800 V and -3200 V
FINU00058 26/10/03 00:23 06:50 HYP 6470 ON ON ON ON ON N.B. 1 hour must be added to run duration due to solar time restored
FINU00060 26/10/03 07:33 09:57 HYP 2485 ON ON ON ON ON  
FINU00061 26/10/03 12:38 14:33 HYP .OR. BHABHA 15470 ON ON ON ON ON  
FINU00062 26/10/03 14:35 15:41 HYP 1055 ON ON ON ON ON  
FINU00063 26/10/03 15:43 15:56 BHABHA 1263 ON ON ON ON ON Trigger test run
FINU00064 26/10/03 16:00 16:39 HYP .OR. BHABHA 5283 ON ON ON ON ON Stopped to make 
laser calibration
CALI03132 26/10/03 16:40 16:51 LASER 5001 ON OFF OFF OFF ON Laser calibration run
FINU00065 26/10/03 16:55 17:12 (.OR. FINO) .AND. (.OR. FONE) 29591 ON ON ON ON ON Trigger test run
FINU00066 26/10/03 17:15 17:20 HYP 32 ON ON ON ON ON Stopped due to DAPHNE people entering in pit
FINU00067 26/10/03 19:04 19:36 HYP 284 ON ON ON ON ON Stopped due to DAPHNE people entering in pit
FINU00068 26/10/03 20:24 22:26 HYP 2137 ON ON ON ON ON Stopped to permit new ISIM-OSIM calibration
FINU00069 26/10/03 22:27 23:14 HYP 612 ON ON ON ON ON Stopped (no pedestal run for ISIM-OSIM)
FINU00070 26/10/03 23:23 07:08 HYP 6683 ON ON ON ON ON  
FINU00071 27/10/03 08:12 08:46 HYP 611 ON ON ON ON ON  
N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. FROM NOW ON:
magnet current from 2585 A to 2580 A
(i.e. field  from 1 T to 0.99789029536 T)
due to technical problems
FINU00072 27/10/03 22:45 23:50 HYP .OR. BHABHA 6237 ON ON ON ON ON Once LMDs trip recovered
FINU00073 27/10/03 23:56 02:30 HYP .OR. BHABHA 14579 ON ON ON ON ON Once LMDs trip recovered
FINU00074 28/10/03 02:32 08:09 HYP 5085 ON ON ON ON ON Once LMDs trip recovered
FINU00075 28/10/03 08:10 15:07 HYP 6174 ON ON ON ON ON  
FINU00077 28/10/03 19:50 21:05 HYP 1289 ON ON ON ON ON Stopped due to DCH 6o+ trip
FINU00078 28/10/03 21:12 22:41 HYP 1526 ON ON ON ON ON  
FINU00081 29/10/03 00:29 01:08 HYP 548 ON ON ON ON ON Stopped to allow DAPHNE people to work in the room
FINU00082 29/10/03 01:42 08:02 HYP 5236 ON ON ON ON ON N.B.: ISIM-OSIM long pedestal runs (noisy spy channels found);
from 06:40 luminosity decreased of about a factor 2
N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. FROM NOW ON:
Collision optics and beam collimators not optimized after activity inside DAPHNE;
magnet current value of 2585 A (field = 1 T) restored
FINU00084 30/10/03 21:06 22:45 HYP .OR. BHABHA 6371 ON ON ON ON ON  
FINU00085 30/10/03 22:51 00:41 HYP .OR. BHABHA 4278 ON ON ON ON ON LMD trips, tofino and STB off during injection
FINU00086 31/10/03 00:42 04:54 HYP .OR. BHABHA 16387 ON ON ON ON ON
FINU00089 31/10/03 05:15 07:30 HYP .OR. BHABHA 8064 ON ON ON ON ON Beam stopped; this caused LMD to trip
FINU00090 31/10/03 08:06 09:18 HYP .OR. BHABHA 5001 ON ON ON ON ON
FINU00091 31/10/03 09:19 10:43 HYP .OR. BHABHA 4937 ON ON ON ON ON
FINU00094 31/10/03 13:21 14:29 BHABHA 1224 ON ON ON ON ON only TOFINO slabs 6 and 12 active
FINU00097 31/10/03 16:24 16:54 BHABHA 559 ON ON ON ON ON only TOFINO slabs 5 and 11 active
FINU00098 31/10/03 17:03 17:22 BHABHA 501 ON ON ON ON ON only TOFINO slabs 4 and 10 active
FINU00099 31/10/03 18:50 19:25 BHABHA 518 ON ON ON ON ON only TOFINO slabs 3 and 9 active
FINU00100 31/10/03 19:26 20:03 BHABHA 501 ON ON ON ON ON only TOFINO slabs 2 and 8 active
FINU00101 31/10/03 20:06 20:51 BHABHA 360 ON ON ON ON ON only TOFINO slabs 1 and 7 active
FINU00102 31/10/03 20:59 23:21 HYP 2574 ON ON ON ON ON
FINU00103 31/10/03 23:34 01:19 HYP 1564 ON ON ON ON ON
 

FINUDA Run Summary (November 2003)