 |
|
 |
|
|
|
|
|
Physics notes
- Stefania and Marco, About the very low angle em calorimeter for the BESIII experiment(
)
- A MC study for n-nbar ISR at BESIII(
)
- Proposal for a new zero degree photon detector at BESIII(
)
- Simulazione dello ZDD segmentato(
)
- Stefania and Marco, GEANT4 simulation of BTF test beam and cosmic ray tests, 19 Aug 2011(
)
- Kai Zhu, Measure &psi'→NN with BESIII detectors, 23 Nov. 2011(
)
ZDD instrumentation notes
- Old ZDD design(
)
- ZDD sketches(
)
- Expected current on the ZDD(
)
- ZDD design with xy positioning system(
)
- Recent ZDD design without xy positioning system(
)
- Most recent ZDD design without xy positioning system(
)
- Adriano, Sommario dati presi alla BTF, 23 May 2011(
)
- Calibration using cosmic rays, 13 Jul 2011(
, )
- Calibration using BTF data, 13 Jul 2011(
, )
- FADC vs. QDC with LNF cosmics data, 27 Sep 2011(
, )
- 1st analysis of IHEP "cosmics" data, 19 Oct 2011(
, )
- IHEP "cosmics" data in up-down coincidence, 2 Nov 2011(
, )
Other internal notes
- ZDD Cell numerology, HV, signal cables, etc 2 Sep 2011(.doc)
- ZDD HV equalizations, 29 Nov 2012(.xls)
- Elettronica (
, )
|
|
 |
|
 |