After the mechanical installation has been concluded, the installation of electronics
and cabling for the Electromagnetic calorimeter is proceeding steadily.
All four EndCaps have been installed, cabled and tested.
In parallel the Data Acquisition system have been instrumented in order to be able
to acquire an half of the calorimeter channels (2440*2).
On February 9th the final HV setting have been downloaded on the South West EndCap
and a selective cosmic trigger (requiring a coincidence between top and bottom
side of the detector) has been setup.
A good integration of Online and Offline software have been achieved.
Work is in progress to
complete the whole DAQ system.