(to obtain SIDDHARTA Technical Notes if you are not member of the Collaboration, please mail the request to Carlo.Guaraldo@lnf.infn.it )
- 2007 -
9) A. Scordo,
M. Bazzi, M. Bragadireanu, M. Catitti, M. Cargnelli, G. Corradi, C. Curceanu, L. Curceanu, C. Fiorini, C. Guaraldo, M.
Iliescu, T. Ishiwatari, P. Levi Sandri,
A. Longoni, V. Lucherini, J.
Marton, K. Nikolics, D.
Pietreanu, T. Ponta, D. Sirghi, F. Sirghi, H. Soltau, L. Strueder, D. Tagnani, O. Vazquez Doce, E. Widmann, J. Zmeskal, Beam Test
Facility (BTF) trigger tests of the SIDDHARTA 1 cm2 Silicon Drift
Detector chip performed in the period 19 March – 1 April 2007, SIDDHARTA
Note-IR-9, 19 June, 2007. ( click for zipped pdf-file )
- 2005 -
8) C. Curceanu (Petrascu), Towards the
definition of the SIDDHARTA setup: Monte Carlo simulations for 3 selected setup
configurations
- 2004 -
7) M. Bragadireanu, M. Catitti, C. Curceanu
(Petrascu), L. Curceanu, C. Fiorini,
H. Fuhrmann, C. Guaraldo,
M. Iliescu, T. Ishiwatari, P. Levi Sandri, A. Longoni, V. Lucherini, J. Marton, D. Pietreanu,T. Ponta, D. Sirghi, F.
Sirghi, H. Soltau, L. Strueder, J. Zmeskal , Rate
dependence of the SDD response (signal position and resolution) during the
trigger tests on a 30 mm2 chip performed at the Beam Test Facility (BTF) of LNF
in the period 13 – 28 July 2004
6) M. Bragadireanu, M. Catitti, C. Curceanu
(Petrascu), L. Curceanu, C. Fiorini,
H. Fuhrmann, C. Guaraldo,
M. Iliescu, T. Ishiwatari, P. Levi Sandri, A. Longoni, V. Lucherini, J. Marton, D.
Pietreanu, T. Ponta, D. Sirghi, F. Sirghi, H. Soltau, L. Strueder, J. Zmeskal, Tests of
trigger on 30 mm2 Silicon Drift Detector prototype performed at the Beam Test
Facility (BTF) of LNF in the period 13 –28 July 2004
5) M. Catitti, C. Fiorini, M. Iliescu, D. Sirghi, F. Sirghi, Progres report on SDD stability improvement, SIDDHARTA
Note-IR-5, 10 May, 2004.( click for
zipped pdf-file )
- 2003 -
1) SIDDHARTA Collaboration, Tests
of prototype Silicon Drift Detectors to be used in SIDDHARTA (Silicon
Drift Detector for Hadronic Atom
Research by Timing Application) performed at the Beam Test
Facility (BTF) of LNF in the period 21 – 31 July 2003, SIDDHARTA
Note-IR-1, 25 August, 2003.( click for
zipped pdf-file )
2) Johannes Zmeskal, The Preliminary SIDDHARTA
(Silicon Drift Detector for Hadronic
Atom Research by Timing Application) experimental
setup, SIDDHARTA Note-IR-2, 25 August, 2003.( click for
zipped pdf-file )
3) Catalina Curceanu (Petrascu), Preliminary Monte
Carlo simulation of the SIDDHARTA (Silicon Drift Detector
for Hadronic Atom Research by Timing
Application) setup and performances, SIDDHARTA
Note-IR-3, 25 August, 2003.( click for
zipped pdf-file )
4) Catalina Curceanu (Petrascu), Preliminary Monte
Carlo simulation of the SIDDHARTA (Silicon Drift Detector
for Hadronic Atom Research by Timing
Application) toroidal setup,
SIDDHARTA Note-IR-4, 24 November, 2003.( click for
zipped pdf-file )
<>