Dear Colleagues,
REMEMBER
We are now in condition of data daking.
This means that we have to record data
using always the trigger: HYP.OR.BHABHA in order to reach the foreseen
statistics in this first phase of FINUDA on DAFNE.
Also, we need to collect as much as possible statistics of "good" events
for the next, beginning of December 2003, meeting of the Scientific
Committee.
HENCE, any different trigger or any different usage of machine time
must be limited only to tests that are essential for the main scope
of the experiment.
During any shift a control of critical performances must be performed
using the monitor program and the event display. This is a DUTY of any
shifter. Soon it will be created also web page, called ONLINE QUALITY
CHECKS, to continuosly monitor sensitive quantities during data taking.
Moreover, during any shift a continuous control of the count rates
and trip events of detectors is mandatory, acting promptly on the DAFNE
teams to inform that their actual handling of beams is dangerous for us
if trips and peak countings are too much frequent.
Any time machine development is under way, the following detectors
must be swhitched off before the dafne team starts:
microvertex and tofino. While the Drift Chambers must be put to a lower,
safe, HV configuration.
All groups are requested to inform L.Passamonti of any electronic
modules sent to repair using the LNF central store.
Moreover, the existing spares of critical modules should be clearly
marked in the armairs in control room.
In the week 17-23 November two periods of machine development are
foreseen: the days of 18 and 20 November. In this periods in principle
the DAFNE hall could be accessible, but this it not granted. While it is
always possible to perform our tests in control room in such periods.
This situation will be repated also the next weeks, with at least one day
dedicated to machine development.
During the machine development, the shift is not suppressed, and shifters
have to stay in control room checking the leakage currents of microvertex,
acting toward dafne team if they become dangerous.
Please, use the following address to send the Shift Report:
finudashift@lnf.infn.it
READ in the private FINUDA web page the "Procedure di
Sicurezza" (Safety Rules: an english version is in preparation).
Shift Schedule Update
November 0-8 8-16 16-24
Tue.18 Bregant Calvo Gianotti
Dalena DeMori Pompili
Wed.19 Krasnoperov Benussi DeMori
DiSanto Dalena Olin
Beer
Thu.20 Bianco DiSanto Dalena
Botta Tomassini Beer
Fri.21 Krasnperov Bianco DiSanto
Olin Botta Derasmo
Sat.22 Dalena Tomassini Bianco
Bregant Pompili Derasmo
Beer Olin
Sun.23 DiSanto Dalena Krasnoperov
Bregant Beer Derasmo
Mon.24 Piano DiSanto Dalena
Olin Bregant Palomba
Beer Lenti
Thu.25 Filippi Bregant Bertani
Elia Tomassini Agnello
Wed.26 Palomba Dalena Filippi
Lenti Elia Morra
Beer
Tue.27 Agnello Palomba Dalena
Krasnoperov Lenti Elia
Olin Beer
Fri.28 Filippi Agnello Palomba
Morra Bertani Lenti
Sat.29 Dalena Filippi Agnello
Elia Morra Lenti
Olin
Sun.30 Palomba Dalena Piano
Fiore Krasnoperov Beer
The RUN
CO-oordinator
N.B.
In case of more shifters in a shift, the first name acts as Shift Leader